Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.
Road vehicles — Circuit breakers — Part 1: Definitions and general test requirements
20.20 Working draft (WD) study initiated
Road vehicles — Circuit breakers — Part 2: User's guide
20.20 Working draft (WD) study initiated
Road vehicles — Circuit breakers — Part 3: Miniature circuit breakers with tabs (Blade type), Form CB11
20.20 Working draft (WD) study initiated
Road vehicles — Circuit breakers — Part 4: Medium circuit breakers with tabs (Blade type), Form CB15
20.20 Working draft (WD) study initiated
Road vehicles — Circuit breakers — Part 5: Circuit breakers with bolt with rated voltage of 450 V
20.20 Working draft (WD) study initiated
Biological evaluation of medical devices — Part 6: Tests for local effects after implantation
20.60 Close of comment period
Plastics piping systems for renovation of underground water supply networks — Part 11: Lining with inserted hoses
20.60 Close of comment period
Thermoplastics pipes, fittings and assemblies for the conveyance of fluids — Determination of the resistance to internal pressure — Part 2: Preparation of pipe test pieces
20.20 Working draft (WD) study initiated
Fiber reinforced plastics-a fishing rod type telescopic ladder-requirements and test methods
20.60 Close of comment period
Lithium carbonate - Determination of elemental impurities by ICP-OES
20.20 Working draft (WD) study initiated
Foodstuffs — General guidelines for single-laboratory validation of qualitative real-time PCR methods
20.60 Close of comment period
Ophthalmic implants — Intraocular lenses — Part 1: Vocabulary
20.99 WD approved for registration as CD
Ophthalmic optics — Contact lenses and contact lens care products — Guidance for clinical investigations
20.99 WD approved for registration as CD
Building construction — Organization of information about construction works — Part 2: Framework for classification
20.20 Working draft (WD) study initiated
Plastics piping systems for water supply and drainage and sewerage under pressure — high impact resistant poly(vinyl chloride) (PVC-HI) pipe
20.20 Working draft (WD) study initiated
Rolling bearings — Profiled rail guides for linear motion rolling bearings — Part 1: Boundary dimensions and tolerances for series 1, 2 and 3
20.00 New project registered in TC/SC work programme
Rolling bearings — Profiled rail guides for linear motion rolling bearings — Part 2: Boundary dimensions and tolerances for series 4 and 5
20.00 New project registered in TC/SC work programme
Plastics pipes and fittings — Equipment for fusion jointing polyethylene systems — Part 2: Electrofusion
20.20 Working draft (WD) study initiated